See the slip before it ships.
For AS9100 shops running high-mix work with plating, heat treat, and inspection sent out. We draw the shop as a Frame on the records you already keep, show which room the late days come out of, and say how far ahead the schedule can honestly see.
- Parts sit at outside vendors and nobody tracks the round trip.
- The master schedule lives in one spreadsheet, rebuilt by hand after every hot job.
- A late part means an NCR, an expedite fee, and a root-cause report the customer wants by Friday.
- current recorded recently; run the week on it
- stale recorded once; ask before you act on it
- dark nobody records it; not zero, unknown
Thirty-five-person AS9100 machine shop
Start with a $400 consultation: a generous half day.
In person when we can. You leave with a Frame sketch on one page and a lot of good questions; within a week, a written proposal with deliverables and a price.