Front
The CI board says it is fixed. The line says otherwise.
For manufacturers running several products on a few lines, with a CI board the plant meets around every week. We draw the floor as a Frame on the line, quality, and shipping logs you already keep, mark what the shift sheet calls down time without a cause as dark, and show whether a fix moved the number it was meant to move.
- Changeovers go on the shift sheet as down time, never by cause.
- Scrap is a month-end number, so the line that made it has moved on.
- A CI card is closed when it moves, and nobody re-measures the line a month later.
- current recorded recently; run the week on it
- stale recorded once; ask before you act on it
- dark nobody records it; not zero, unknown
Mid-size manufacturer, two lines, a CI board
Start with a $400 consultation: a generous half day.
In person when we can. You leave with a Frame sketch on one page and a lot of good questions; within a week, a written proposal with deliverables and a price.