Aerospace & defense machine shops

See the slip before it ships.

The slip seen before it ships, not after.

For AS9100 shops running high-mix work with plating, heat treat, and inspection sent out. We draw the shop as a Frame on the records you already keep, show which room the late days come out of, and say how far ahead the schedule can honestly see.

Where the week goes

  • Parts sit at outside vendors and nobody tracks the round trip.
  • The master schedule lives in one spreadsheet, rebuilt by hand after every hot job.
  • A late part means an NCR, an expedite fee, and a root-cause report the customer wants by Friday.

Thirty-five-person AS9100 machine shop

Your Frame The floor Spindle hoursbooked, next week Outsideprocessing Parts out at plating& heat treat Quality Open NCRs The schedule The master schedule Job travelers 112% PO log 9 jobs Not recordedanywhere Days parts sit atoutside vendors NCR log 4 Schedulespreadsheet rebuilt 6 days ago

Sample — illustrative mock-up

Thirty-five-person AS9100 machine shop

Sample — illustrative mock-up Open NCRs
today the review trigger · 5 Tue – next Fri Days parts sit at outside vendors: nobody records it, so no forecast
Above, open nonconformances reaches the review trigger between Tuesday and next Friday.

Thirty-five-person AS9100 machine shop

Your Frame Open NCRs the forecast reaches the reviewtrigger Book the quality review → Calendar invite to quality on it reaches the review trigger within2 days Tell the owner → Text message off no update to open nonconformances in3 days Ask for a recount → Message to whoever keeps it on

Sample — illustrative mock-up

Solid: on today's number. Dashed: on the forecast. Each one is a switch.

Start with a $400 consultation: a generous half day.

We walk the floor with whoever runs the schedule. In person when we can. You leave with a Frame sketch on one page and a lot of good questions; within a week, a written proposal with deliverables and a price.

805-888-2449

Book the consultation