Maintenance and reliability team
Three buildings, a planner, two crews, and a maintenance system. PMs, the backlog, and unplanned stops are current, read straight from its exports. Next week's crew plan is stale; it was built on Monday. Three things are dark: work orders waiting on parts, the spares on the shelf checked against the equipment list, and the hours spent rebuilding the schedule. When a spare is missing, the work order waits, PMs slip past due, and the unplanned stops follow. The Frame shows that chain and writes nothing back: work orders, calibration records, and sign-offs stay in the maintenance system.
Sample — illustrative mock-up
Plant maintenance team, three buildings (sample)
The company and the numbers are invented. The shape is the one we find.
as of March 6, 2026 at 17:00 UTC
4 current 3 stale 3 dark
Two weeks back, one week ahead
Each row is one record. The band pinches when the record changes and widens as it ages. Past today it is the Frame looking ahead, and it stops where it can no longer say.
- the record changed
- top row: how far ahead the whole picture could see, day by day
- your own move, marked so the Frame doesn't read it as a trend
- a change in one row showing up in another, and how long it took
- already on the calendar, so it doesn't fade
- Past this line the Frame can't say: Parts is dark.
Preventive maintenance
2 sensors · 2 current · 0 stale · 0 dark
- PMs done on time, this month current86%
age 8h
maintenance export, read-only
- PMs past due current14
age 8h
maintenance export, read-only
Work order backlog
2 sensors · 1 current · 0 stale · 1 dark
- Open corrective work orders current212
age 8h
maintenance export, read-only
- Work orders waiting on parts darkDARK
age —
not split out of the backlog
Spares
2 sensors · 0 current · 1 stale · 1 dark
- Critical spares on hand darkDARK
age —
not checked against the asset list
- Spares inventory value stale$1.2M
age 60d
year-end count
Planner & crews
2 sensors · 0 current · 1 stale · 1 dark
- Crew hours booked, next week stale104%
age 4d
crew plan, built Monday
- Hours spent rebuilding the schedule darkDARK
age —
never counted
Critical equipment
2 sensors · 1 current · 1 stale · 0 dark
- Unplanned stops this month current6
age 8h
maintenance export, read-only
- Condition readings reviewed stale9 days ago
age 9d
route sheets
- Critical spares on hand feeds → Work orders waiting on parts
- Work orders waiting on parts feeds → Open corrective work orders
- Work orders waiting on parts feeds → PMs past due
- Crew hours booked, next week feeds → PMs past due
- Hours spent rebuilding the schedule feeds → Crew hours booked, next week
- PMs past due feeds → Unplanned stops this month
- Condition readings reviewed feeds → Unplanned stops this month
a value nobody measured is null and renders dark, never zero
Start with a $400 consultation: a generous half day.
In person when we can. You leave with a Frame sketch on one page and a lot of good questions; within a week, a written proposal with deliverables and a price.
Sample — illustrative mock-up
Plant maintenance team, three buildings (sample)
Two weeks back, one week ahead
Each row is one record. The band pinches when the record changes and widens as it ages. Past today it is the Frame looking ahead, and it stops where it can no longer say.
- the record changed
- top row: how far ahead the whole picture could see, day by day
- your own move, marked so the Frame doesn't read it as a trend
- a change in one row showing up in another, and how long it took
- already on the calendar, so it doesn't fade
- Past this line the Frame can't say: Parts is dark.
This sample, three ways
Plant maintenance team, three buildings
Sample — illustrative mock-up
Plant maintenance team, three buildings
Plant maintenance team, three buildings
Sample — illustrative mock-up