All samples

Continuous improvement on the floor

Two lines, a quality lab, a shipping dock, and a CI board the plant meets around every week. OEE and on-time delivery are current, read from the line and shipping logs. Scrap is stale: the last report is eighteen days old. Three things are dark: the minutes lost to changeovers, which the shift sheet calls down time with no cause; rework hours, clocked to the job; and whether a fix held, because a card is closed when it moves, never re-measured. The Frame reads those logs as they are and writes nothing back.

Sample — illustrative mock-up

Mid-size manufacturer, two lines, a CI board (sample)

The company and the numbers are invented. The shape is the one we find.

as of March 6, 2026 at 17:00 UTC

5 current 2 stale 3 dark

2d laterProduction linesChangeoversQualityShippingCI boardOEE, line 1, thisweekOEE, line 2, thisweekMinutes lost tochangeoversChangeovers thisweekScrap rate, lastreportRework hoursOn-time delivery,this monthOrders past dueOpen CI actionsFixes re-measuredon the line
currentstaledark

Two weeks back, one week ahead

Each row is one record. The band pinches when the record changes and widens as it ages. Past today it is the Frame looking ahead, and it stops where it can no longer say.

Feb 20 Feb 27 today · Mar 6 Mar 13 how far ahead it could see 1.2d OEE, line 1, this week 71% sees 2d waits on minutes lost to changeovers, dark Minutes lost tochangeovers DARK dark · on the shift sheet as down time, no cause Scrap rate, last report 3.8% can't say On-time delivery, thismonth 91% sees 2d waits on minutes lost to changeovers, dark Open CI actions 31 sees 2d waits on fixes re-measured on the line, dark 2d later
  • the record changed
  • top row: how far ahead the whole picture could see, day by day
  • your own move, marked so the Frame doesn't read it as a trend
  • a change in one row showing up in another, and how long it took
  • already on the calendar, so it doesn't fade
  • Past this line the Frame can't say: Plan is dark.

Production lines

2 sensors · 2 current · 0 stale · 0 dark

  • OEE, line 1, this week current
    71%

    age 8h

    line log, read-only

  • OEE, line 2, this week current
    64%

    age 8h

    line log, read-only

Changeovers

2 sensors · 1 current · 0 stale · 1 dark

  • Minutes lost to changeovers dark
    DARK

    age —

    on the shift sheet as down time, no cause

  • Changeovers this week current
    23

    age 8h

    production schedule

Quality

2 sensors · 0 current · 1 stale · 1 dark

  • Scrap rate, last report stale
    3.8%

    age 18d

    month-end quality report

  • Rework hours dark
    DARK

    age —

    clocked to the job, never to rework

Shipping

2 sensors · 2 current · 0 stale · 0 dark

  • On-time delivery, this month current
    91%

    age 8h

    shipping log, read-only

  • Orders past due current
    9

    age 8h

    shipping log, read-only

CI board

2 sensors · 0 current · 1 stale · 1 dark

  • Open CI actions stale
    31

    age 7d

    CI board, updated at the weekly meeting

  • Fixes re-measured on the line dark
    DARK

    age —

    closed when the card moves, never re-measured

  • Minutes lost to changeovers feeds → OEE, line 1, this week
  • Minutes lost to changeovers feeds → OEE, line 2, this week
  • Rework hours feeds → Scrap rate, last report
  • OEE, line 1, this week feeds → On-time delivery, this month
  • Scrap rate, last report feeds → On-time delivery, this month
  • Orders past due feeds → On-time delivery, this month
  • Fixes re-measured on the line feeds → Open CI actions

a value nobody measured is null and renders dark, never zero

Start with a $400 consultation: a generous half day.

In person when we can. You leave with a Frame sketch on one page and a lot of good questions; within a week, a written proposal with deliverables and a price.

805-888-2449

Sample — illustrative mock-up

Mid-size manufacturer, two lines, a CI board (sample)

Two weeks back, one week ahead

Each row is one record. The band pinches when the record changes and widens as it ages. Past today it is the Frame looking ahead, and it stops where it can no longer say.

Feb 20 Feb 27 today · Mar 6 Mar 13 how far ahead it could see 1.2d OEE, line 1, this week 71% sees 2d waits on minutes lost to changeovers, dark Minutes lost tochangeovers DARK dark · on the shift sheet as down time, no cause Scrap rate, last report 3.8% can't say On-time delivery, thismonth 91% sees 2d waits on minutes lost to changeovers, dark Open CI actions 31 sees 2d waits on fixes re-measured on the line, dark 2d later
  • the record changed
  • top row: how far ahead the whole picture could see, day by day
  • your own move, marked so the Frame doesn't read it as a trend
  • a change in one row showing up in another, and how long it took
  • already on the calendar, so it doesn't fade
  • Past this line the Frame can't say: Plan is dark.

This sample, three ways

Mid-size manufacturer, two lines, a CI board

Your Frame Production lines OEE, line 1, thisweek Changeovers Changeovers thisweek Quality Scrap rate, lastreport Shipping On-time delivery,this month Line log 71% Productionschedule 23 Not recordedanywhere Minutes lost tochangeovers Quality report 3.8%18 days old Shipping log 91%

Sample — illustrative mock-up

Mid-size manufacturer, two lines, a CI board

Sample — illustrative mock-up On-time delivery, this month
today the on-time target · 89% Mon – Tue Minutes lost to changeovers: nobody records it, so no forecast
Above, on-time delivery reaches the on-time target Monday or Tuesday.

Mid-size manufacturer, two lines, a CI board

Your Frame On-time delivery, this month no update to on-time delivery in 3days Ask for a recount → Message to whoever keeps it on the forecast reaches the on-timetarget Warn the customers on lateorders → Email drafts, for approval on it reaches the on-time target within2 days Tell the owner → Text message off

Sample — illustrative mock-up

Solid: on today's number. Dashed: on the forecast. Each one is a switch.